FEATURED LAND USE ZONING PROJECTS

Snow Avalanche Risk Zoning for Proposed Sub-division, Mount Robson, BC
Client: McElhanney Consulting Services Ltd.
Dynamic conducted an investigation of snow avalanche hazard for a potential residential development area located adjacent to Highway 16, 87 km west of Jasper, AB near the base of Mt. Robson, BC. Through detail field studies and avalanche runout modelling we provided an avalanche hazard assessment and determined required setbacks for locating permanent residential structures.

Johnsons Landing: Residential Avalanche Risk Zoning
Client: SNT Engineering
Dynamic performed residential avalanche hazard zoning following the landslide at Johnsons Landing, located approximately 110 km north of Creston, BC. We used detailed field studies and avalanche flow dynamics modelling to determine avalanche runout positions and corresponding hazard zones in accordance with relevant risk guidelines.

Sunshine Valley Debris Slide Avalanche Risk to Hwy 3
Client: BC Ministry of Transportation and Infrastructure
The BC Ministry of Transportation and Infrastructure retained Dynamic to evaluate the potential for snow avalanches within a recent landslide scar to affect Highway 3 at Sunshine Valley, BC. We provided avalanche runout estimates and an avalanche risk assessment for the highway at this location.